Feasibility Study and Detail Design of Car Ferry Services in Central Region between Nakorn Sawan and Samuth Prakarn |
วันเริ่มสัญญา (Start) :
วันสิ้นสุดสัญญา (Finish) :
มูลค่าโครงการ (Fee):
เลขที่สัญญา (Ref No.):
เจ้าของโครงการ (Client) :
|
24 September 1996
26 March 1998
3,480,000 Baht
104/2539
Harbour Department
|

|
Project Description
River in one view is an obstacle of land transport between river banks. To
resolve this problem, either bridge or car ferry may be selected. The major
issue in consideration was cost benefit between bridge and car ferry. Thai
Harbour Department employed Golden Plan to conducted a study on this issue for
the Thai Central Region. The most appropriate site in this study located
at Samuth Prakarn that congestion with industrial estate and truck traffic.
According to term of reference GP designed two car ferries consisted of large
and medium size.
Services
In order to meet the projects term of reference Golden Plan had conducted the following tasks:
- Collected all relevant data,
- Conducted field survey, identify potential site according to road
network,
- Evaluated traffic demand, identified the required facilities,
- Prepared a preliminary design, carried a feasibility study,
- Conducted a detail design of two car ferries and infrastructure
- Prepared bidding documents: drawings, specification, bidding conditions
and budget.